ITAC Assessment: IC0222
ITAC logo
ITAC Assessment: IC0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product High Value Technical Pouches
NAICS 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 65,000
ft2
Annual Production 148,000,000
units
Production Hrs. Annual 2,600
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,566 513,736
kWh
Electricity Demand $27,951 4,461
kW-mo/yr
Natural Gas $20,890 4,410
MMBtu
TOTAL YEARLY COSTS $78,408
RECOMMENDED SAVINGS* $5,644 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,363

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,363 $2,231 $3,014
50,234
kWh
$1,349
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $757 $320 $512
8,528
kWh
$245
-
kW-mo/yr
03 2.3132: Recharge batteries on during off-peak demand periods $524 - - $524
-
kW-mo/yr
TOTAL RECOMMENDED $5,644 $2,551 $3,526
58,762
kWh
$2,118
-
kW-mo/yr
TOTAL IMPLEMENTED $4,363 $2,231 $3,014
50,234
kWh
$1,349
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs