Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Laboratory apparatus and furniture
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0136 #05 Y:1996 Utilize higher efficiency lamps and/or ballasts $3,979 $5,928
SD0136 #04 Y:1996 Use optimum thickness insulation $1,905 $651
SD0136 #03 Y:1996 Reduce the pressure of compressed air to the minimum required $1,321 $40
SD0136 #02 Y:1996 Preheat combustion air with waste heat $2,074 $2,083
SD0136 #01 Y:1996 Use most efficient type of electric motors $2,889 $3,260
SD0135 #08 Y:1996 Lease / purchase baler; sell cardboard to recycler $100 $150
SD0135 #07 Y:1996 Recover and reuse waste material $100 -
SD0135 #06 Y:1996 Install occupancy sensors $2,105 $2,127
SD0135 #05 Y:1996 Install spectral reflectors / delamp $17,409 $20,135
SD0135 #04 Y:1996 Utilize higher efficiency lamps and/or ballasts $9,084 $20,412
SD0135 #03 Y:1996 Reduce the pressure of compressed air to the minimum required $1,739 $40
SD0135 #02 Y:1996 Utilize an evaporative air pre-cooler or other heat exchanger in ac system $3,735 $6,300
SD0135 #01 Y:1996 Use most efficient type of electric motors $2,152 $1,450
AM0265 #06 Y:1996 Make a practice of turning off lights when not needed $200 $300
AM0265 #05 Y:1996 Recover waste heat from equipment $860 $380
AM0265 #04 Y:1996 Pay utility bills on time $1,010 -
AM0265 #03 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $1,550 $240
AM0265 #02 Y:1996 Utilize higher efficiency lamps and/or ballasts $1,260 $760
AM0265 #01 Y:1996 Use a less expensive method of waste removal $3,100 $750
ME0128 #06 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $483 $450