ITAC Assessment: ME0128
ITAC logo
ITAC Assessment: ME0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Biological Cabinets
NAICS
n/a
SIC 3821: Laboratory Apparatus and Furniture
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 63,000
ft2
Annual Production 2,946
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $142,540 1,275,498
kWh
LPG $38,726 6,411
MMBtu
Fuel Oil #2 $5,625 964
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,857

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7221: Lower temperature during the winter season and vice-versa $2,591 $2,250 - $2,591
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $887 $100 $887
8,499
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $938 $20 $938
8,792
kWh
-
04 2.7444: Close holes and openings in building such as broken windows $1,845 $1,120 - $1,845
-
MMBtu
05 2.4239: Eliminate or reduce compressed air usage $2,886 $3,000 - $2,886
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $483 $450 $483
4,689
kWh
-
TOTAL RECOMMENDED $9,630 $6,940 $2,308
21,980
kWh
$7,322
-
MMBtu
TOTAL IMPLEMENTED $5,857 $3,840 $1,421
13,481
kWh
$4,436
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs