ITAC Assessment: TA0111
ITAC logo
ITAC Assessment: TA0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product drill bits and hammers
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 120,000
ft2
Annual Production 18,500
pieces
Production Hrs. Annual 6,884
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $280,994 4,497,500
kWh
Electricity Fees $58,762 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $343,888 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 4.521: Clear and rent existing space $225,000 $2,250 - - - $225,000
02 2.7229: Air condition only space necessary $51,150 - $43,870
700,408
kWh
$7,280
-
kW-mo/yr
- -
03 2.4226: Use / purchase optimum sized compressor $44,045 $20,000 $38,445
613,843
kWh
$5,600
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,913 $400 $15,623
249,460
kWh
$2,290
-
kW-mo/yr
- -
05 2.3212: Optimize plant power factor $2,750 $5,500 - - $2,750 -
06 2.7122: Disconnect ballasts $1,660 $140 $1,450
23,130
kWh
$210
-
kW-mo/yr
- -
07 2.6218: Turn off equipment when not in use $1,370 $10 $1,370
21,852
kWh
- - -
TOTAL RECOMMENDED $343,888 $28,300 $100,758
1,608,693
kWh
$15,380
-
kW-mo/yr
$2,750 $225,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs