Assessment Year | 1996 |
---|---|
Principal Product | Chemical laboratory molded epoxy sinks and work surfaces |
NAICS |
n/a
|
SIC | 3821: Laboratory Apparatus and Furniture |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
75,000
ft2
|
Annual Production | 132,000
pieces
|
Production Hrs. Annual | 4,301
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $82,022 | 2,220,692 |
kWh
|
$0.037 |
Electricity Demand | $44,074 | 5,403 |
kW-mo/yr
|
$8.16 |
Electricity Fees | $1,193 | - |
|
- |
Natural Gas | $40,022 | 10,043 |
MMBtu
|
$3.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,980 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,110 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.6192: Use a less expensive method of waste removal | $3,100 | $750 | - | - | - | $3,100 | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,260 | $760 |
$660
23,740
kWh
|
$600
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,550 | $240 |
$1,550
55,393
kWh
|
- | - | - | - | |
04 | 2.8123: Pay utility bills on time | $1,010 | - | - | - | - | - | $1,010 | |
05 | 2.2437: Recover waste heat from equipment | $860 | $380 | - | - |
$860
-
MMBtu
|
- | - | |
06 | 2.7124: Make a practice of turning off lights when not needed | $200 | $300 |
$200
7,327
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $7,980 | $2,430 |
$2,410
86,460
kWh
|
$600
-
kW-mo/yr
|
$860
-
MMBtu
|
$3,100 | $1,010 | ||
TOTAL IMPLEMENTED | $6,110 | $2,050 |
$2,410
86,460
kWh
|
$600
-
kW-mo/yr
|
- | $3,100 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs