ITAC Assessment: LT0116
ITAC logo
ITAC Assessment: LT0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product ALUMINUM BOATS AND TANKS
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $1
M
to 5
M
# of Employees 90
Plant Area
n/a
Annual Production 3,000
pieces
Production Hrs. Annual 2,168
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,759 375,147
kWh
Natural Gas $30,750 7,339
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $2,010 - - $2,010
-
MMBtu
-
02 2.2531: Re-size charging openings or add movable cover or door $3,550 $6,525 - $3,550
-
MMBtu
-
03 2.2511: Insulate bare equipment $377 $800 - $377
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $351 - $351
4,982
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,890 $2,815 $2,500
35,170
kWh
- $390
06 2.7142: Utilize higher efficiency lamps and/or ballasts $55 $49 $55
879
kWh
- -
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $660 - $660
13,189
kWh
- -
TOTAL RECOMMENDED $9,893 $10,189 $3,566
54,220
kWh
$5,937
-
MMBtu
$390
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs