ITAC Assessment: SD0136
ITAC logo
ITAC Assessment: SD0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Pyrogenic External Torches
NAICS
n/a
SIC 3821: Laboratory Apparatus and Furniture
Sales Range $5
M
to 10
M
# of Employees 188
Plant Area 76,500
ft2
Annual Production 350
units
Production Hrs. Annual 4,992
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,699 1,774,912
kWh
Electricity Demand $28,605 3,897
kW-mo/yr
Natural Gas $72,756 11,787
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,801 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,801

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $2,889 $3,260 $2,889
28,722
kWh
- -
02 2.2442: Preheat combustion air with waste heat $2,074 $2,083 - $2,074
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,321 $40 $1,321
13,775
kWh
- -
04 2.2515: Use optimum thickness insulation $1,905 $651 $1,905
89,977
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,979 $5,928 $3,979
41,618
kWh
- -
06 2.7144: Install spectral reflectors / delamp $6,002 $4,080 $6,002
62,720
kWh
- -
07 2.7135: Install occupancy sensors $1,471 $1,001 $1,471
15,240
kWh
- -
08 3.1192: Reduce scrap production $56,160 - - - $56,160
-
lb
TOTAL RECOMMENDED $75,801 $17,043 $17,567
252,052
kWh
$2,074
-
MMBtu
$56,160
-
lb
TOTAL IMPLEMENTED $75,801 $17,043 $17,567
252,052
kWh
$2,074
-
MMBtu
$56,160
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs