Assessment Year | 1996 |
---|---|
Principal Product | Pyrogenic External Torches |
NAICS |
n/a
|
SIC | 3821: Laboratory Apparatus and Furniture |
Sales Range | $5 M to 10M |
# of Employees | 188 |
Plant Area |
76,500
ft2
|
Annual Production | 350
units
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $139,699 | 1,774,912 |
kWh
|
$0.079 |
Electricity Demand | $28,605 | 3,897 |
kW-mo/yr
|
$7.34 |
Natural Gas | $72,756 | 11,787 |
MMBtu
|
$6.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,801 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $75,801 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,889 | $3,260 |
$2,889
28,722
kWh
|
- | - | |
02 | 2.2442: Preheat combustion air with waste heat | $2,074 | $2,083 | - |
$2,074
-
MMBtu
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,321 | $40 |
$1,321
13,775
kWh
|
- | - | |
04 | 2.2515: Use optimum thickness insulation | $1,905 | $651 |
$1,905
89,977
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,979 | $5,928 |
$3,979
41,618
kWh
|
- | - | |
06 | 2.7144: Install spectral reflectors / delamp | $6,002 | $4,080 |
$6,002
62,720
kWh
|
- | - | |
07 | 2.7135: Install occupancy sensors | $1,471 | $1,001 |
$1,471
15,240
kWh
|
- | - | |
08 | 3.1192: Reduce scrap production | $56,160 | - | - | - |
$56,160
-
lb
|
|
TOTAL RECOMMENDED | $75,801 | $17,043 |
$17,567
252,052
kWh
|
$2,074
-
MMBtu
|
$56,160
-
lb
|
||
TOTAL IMPLEMENTED | $75,801 | $17,043 |
$17,567
252,052
kWh
|
$2,074
-
MMBtu
|
$56,160
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs