ITAC Assessment: OR0758
ITAC logo
ITAC Assessment: OR0758
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 3,201,660
ft2
Annual Production 40,150,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,455,090 23,255,455
kWh
Electricity Demand $267,318 61,594
kW-mo/yr
Electricity Fees $110,103 -
Natural Gas $317,333 56,283
MMBtu
TOTAL YEARLY COSTS $2,149,844
RECOMMENDED SAVINGS* $258,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 4.652: Replace existing equipment with more suitable substitutes $217,268 $1,015,000 $186,888
2,986,861
kWh
$17,880
-
kW-mo/yr
$12,500 -
02 2.8123: Pay utility bills on time $1,874 - - - - $1,874
03 3.1194: Use automatic flow control $39,055 $90,000 $39,055
624,182
kWh
- - -
TOTAL RECOMMENDED $258,197 $1,105,000 $225,943
3,611,043
kWh
$17,880
-
kW-mo/yr
$12,500 $1,874
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs