Assessment Year | 1996 |
---|---|
Principal Product | Automated Chemical Vapor Deposition Systems |
NAICS |
n/a
|
SIC | 3821: Laboratory Apparatus and Furniture |
Sales Range | $100 M to 500M |
# of Employees | 438 |
Plant Area |
88,000
ft2
|
Annual Production | 250
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $245,267 | 3,623,388 |
kWh
|
$0.068 |
Electricity Demand | $75,964 | 6,938 |
kW-mo/yr
|
$10.95 |
Natural Gas | $5,546 | 809 |
MMBtu
|
$6.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,424 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,424 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,152 | $1,450 |
$2,152
26,084
kWh
|
- | |
02 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $3,735 | $6,300 |
$3,735
28,722
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,739 | $40 |
$1,739
21,102
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,084 | $20,412 |
$9,084
81,770
kWh
|
- | |
05 | 2.7144: Install spectral reflectors / delamp | $17,409 | $20,135 |
$17,409
162,075
kWh
|
- | |
06 | 2.7135: Install occupancy sensors | $2,105 | $2,127 |
$2,105
19,343
kWh
|
- | |
07 | 3.5311: Recover and reuse waste material | $100 | - | - |
$100
-
lb
|
|
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $100 | $150 | - |
$100
-
lb
|
|
TOTAL RECOMMENDED | $36,424 | $50,614 |
$36,224
339,096
kWh
|
$200
-
lb
|
||
TOTAL IMPLEMENTED | $36,424 | $50,614 |
$36,224
339,096
kWh
|
$200
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs