Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Laboratory apparatus and furniture
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0310 #05 Y:2004 Use optimum size and capacity equipment $1,451 $3,000
NC0310 #04 Y:2004 Change rate schedules or other changes in utility service $34,863 $30,000
NC0310 #03 Y:2004 Modify process to reduce material use/cost $60,000 $20,500
NC0310 #02 Y:2004 Develop standard procedures to improve internal yields $97,500 $61,250
NC0310 #01 Y:2004 Optimize lot sizes to reduce inventory carrying costs $167,500 $150,000
NC0307 #07 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $2,171 $100
NC0307 #06 Y:2004 Utilize higher efficiency lamps and/or ballasts $313 $381
NC0307 #05 Y:2004 Utilize energy-efficient belts and other improved mechanisms $1,342 $1,456
NC0307 #04 Y:2004 Recover waste heat from equipment $16,989 $31,278
NC0307 #03 Y:2004 Recycle air for heating, ventilation and air conditioning $32,361 $24,000
NC0307 #02 Y:2004 Develop standard procedures to improve internal yields $72,400 $49,500
NC0307 #01 Y:2004 Optimize lot sizes to reduce inventory carrying costs $151,225 $150,000
KU0554 #05 Y:2000 Use demand controller or load shedder $620 $2,000
KU0554 #04 Y:2000 Turn off equipment during breaks, reduce operating time $1,445 -
KU0554 #03 Y:2000 Install compressor air intakes in coolest locations $1,480 $1,810
KU0554 #02 Y:2000 Turn off equipment during breaks, reduce operating time $3,829 -
KU0554 #01 Y:2000 Preheat combustion air with waste heat $2,875 $13,000
SD0136 #08 Y:1996 Reduce scrap production $56,160 -
SD0136 #07 Y:1996 Install occupancy sensors $1,471 $1,001
SD0136 #06 Y:1996 Install spectral reflectors / delamp $6,002 $4,080