160
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Laboratory apparatus and furniture | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0310 #05 Y:2004 | 05 | 2004 | Use optimum size and capacity equipment | $1,451 | $3,000 | |
| NC0310 #04 Y:2004 | 04 | 2004 | Change rate schedules or other changes in utility service | $34,863 | $30,000 | |
| NC0310 #03 Y:2004 | 03 | 2004 | Modify process to reduce material use/cost | $60,000 | $20,500 | |
| NC0310 #02 Y:2004 | 02 | 2004 | Develop standard procedures to improve internal yields | $97,500 | $61,250 | |
| NC0310 #01 Y:2004 | 01 | 2004 | Optimize lot sizes to reduce inventory carrying costs | $167,500 | $150,000 | |
| NC0307 #07 Y:2004 | 07 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,171 | $100 | |
| NC0307 #06 Y:2004 | 06 | 2004 | Utilize higher efficiency lamps and/or ballasts | $313 | $381 | |
| NC0307 #05 Y:2004 | 05 | 2004 | Utilize energy-efficient belts and other improved mechanisms | $1,342 | $1,456 | |
| NC0307 #04 Y:2004 | 04 | 2004 | Recover waste heat from equipment | $16,989 | $31,278 | |
| NC0307 #03 Y:2004 | 03 | 2004 | Recycle air for heating, ventilation and air conditioning | $32,361 | $24,000 | |
| NC0307 #02 Y:2004 | 02 | 2004 | Develop standard procedures to improve internal yields | $72,400 | $49,500 | |
| NC0307 #01 Y:2004 | 01 | 2004 | Optimize lot sizes to reduce inventory carrying costs | $151,225 | $150,000 | |
| KU0554 #05 Y:2000 | 05 | 2000 | Use demand controller or load shedder | $620 | $2,000 | |
| KU0554 #04 Y:2000 | 04 | 2000 | Turn off equipment during breaks, reduce operating time | $1,445 | - | |
| KU0554 #03 Y:2000 | 03 | 2000 | Install compressor air intakes in coolest locations | $1,480 | $1,810 | |
| KU0554 #02 Y:2000 | 02 | 2000 | Turn off equipment during breaks, reduce operating time | $3,829 | - | |
| KU0554 #01 Y:2000 | 01 | 2000 | Preheat combustion air with waste heat | $2,875 | $13,000 | |
| SD0136 #08 Y:1996 | 08 | 1996 | Reduce scrap production | $56,160 | - | |
| SD0136 #07 Y:1996 | 07 | 1996 | Install occupancy sensors | $1,471 | $1,001 | |
| SD0136 #06 Y:1996 | 06 | 1996 | Install spectral reflectors / delamp | $6,002 | $4,080 |