ITAC Assessment: KU0554
ITAC logo
ITAC Assessment: KU0554
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product laboratory equipment
NAICS
n/a
SIC 3821: Laboratory Apparatus and Furniture
Sales Range $10
M
to 50
M
# of Employees 181
Plant Area 160,000
ft2
Annual Production 35,000,000
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,912 1,958,290
kWh
Electricity Demand $31,635 6,533
kW-mo/yr
Electricity Fees $21,403 -
Natural Gas $53,840 12,334
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,249 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,274

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2442: Preheat combustion air with waste heat $2,875 $13,000 - - $2,875
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $3,829 - - $997
-
kW-mo/yr
$2,832
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $1,480 $1,810 $1,140
21,102
kWh
$340
-
kW-mo/yr
-
04 2.6212: Turn off equipment during breaks, reduce operating time $1,445 - $1,445
26,671
kWh
- -
05 2.3191: Use demand controller or load shedder $620 $2,000 - $620
-
kW-mo/yr
-
TOTAL RECOMMENDED $10,249 $16,810 $2,585
47,773
kWh
$1,957
-
kW-mo/yr
$5,707
-
MMBtu
TOTAL IMPLEMENTED $5,274 - $1,445
26,671
kWh
$997
-
kW-mo/yr
$2,832
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs