| Assessment Year | 2000 |
|---|---|
| Principal Product | laboratory equipment |
| NAICS |
n/a
|
| SIC | 3821: Laboratory Apparatus and Furniture |
| Sales Range | $10 M to 50M |
| # of Employees | 181 |
| Plant Area |
160,000
ft2
|
| Annual Production | 35,000,000
pieces
|
| Production Hrs. Annual | 4,290
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $90,912 | 1,958,290 |
kWh
|
$0.046 |
| Electricity Demand | $31,635 | 6,533 |
kW-mo/yr
|
$4.84 |
| Electricity Fees | $21,403 | - |
|
- |
| Natural Gas | $53,840 | 12,334 |
MMBtu
|
$4.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,249 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,274 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2442: Preheat combustion air with waste heat | $2,875 | $13,000 | - | - |
$2,875
-
MMBtu
|
|
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,829 | - | - |
$997
-
kW-mo/yr
|
$2,832
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,480 | $1,810 |
$1,140
21,102
kWh
|
$340
-
kW-mo/yr
|
- | |
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,445 | - |
$1,445
26,671
kWh
|
- | - | |
| 05 | 2.3191: Use demand controller or load shedder | $620 | $2,000 | - |
$620
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $10,249 | $16,810 |
$2,585
47,773
kWh
|
$1,957
-
kW-mo/yr
|
$5,707
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $5,274 | - |
$1,445
26,671
kWh
|
$997
-
kW-mo/yr
|
$2,832
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs