ITAC Assessment: SD0497
ITAC logo
ITAC Assessment: SD0497
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product latex emulsion
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 40
Plant Area 196,200
ft2
Annual Production 80,001
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $308,943 4,107,349
kWh
Electricity Demand $205,059 7,674
kW-mo/yr
Electricity Fees $40,433 -
Natural Gas $117,425 15,302
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $184,075 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $118,874 $425,000 $114,844
2,080,500
kWh
$66,800
-
kW-mo/yr
$(-62,770.0)
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,403 $14,111 $15,403
204,833
kWh
- -
03 2.7261: Install timers and/or thermostats $15,039 $2,275 $15,039
199,992
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,837 $1,500 $5,665
75,336
kWh
$3,172
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,591 $14,085 $5,047
67,113
kWh
$2,544
-
kW-mo/yr
-
06 2.2414: Use waste heat from hot flue gases to preheat $7,238 $10,050 - - $7,238
-
MMBtu
07 2.7111: Reduce illumination to minimum necessary levels $6,323 $1,580 $4,133
54,953
kWh
$2,190
-
kW-mo/yr
-
08 2.2414: Use waste heat from hot flue gases to preheat $3,817 $12,575 - - $3,817
-
MMBtu
09 2.7135: Install occupancy sensors $953 $1,745 $953
12,668
kWh
- -
TOTAL RECOMMENDED $184,075 $482,921 $161,084
2,695,395
kWh
$74,706
-
kW-mo/yr
$(-51,715.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs