ITAC Assessment: LL0321
ITAC logo
ITAC Assessment: LL0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Modular conveyoe belts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 55,924
ft2
Annual Production 16,114
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,572,995 38,919,900
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,306 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $26,101 $6,360 $26,101
284,330
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $11,987 $30 $11,987
130,580
kWh
03 2.2511: Insulate bare equipment $3,253 $4,564 $3,253
35,441
kWh
04 2.2511: Insulate bare equipment $1,366 $734 $1,366
14,879
kWh
05 2.6211: Conserve energy by efficient use of vending machines $802 $779 $802
8,736
kWh
06 2.7111: Reduce illumination to minimum necessary levels $797 $55 $797
8,683
kWh
TOTAL RECOMMENDED $44,306 $12,522 $44,306
482,649
kWh
TOTAL IMPLEMENTED $42,707 $11,688 $42,707
465,230
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs