Assessment Year | 2023 |
---|---|
Principal Product | margarine, frying oils |
NAICS | 311225: Fats and Oils Refining and Blending |
SIC | 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 215 |
Plant Area |
167,000
ft2
|
Annual Production | 367,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $530,717 | 9,158,109 |
kWh
|
$0.058 | |
Electricity Demand | $185,404 | 19,118 |
kW-mo/yr
|
$9.70 | |
Natural Gas | $245,528 | 38,355 |
MMBtu
|
$6.40 | |
Waste Disposal Costs | |||||
Water Usage | $60,369 | 17,460 |
Tgal
|
$3.46 | |
Water Disposal | $85,312 | 17,460 |
Tgal
|
$4.89 | |
TOTAL YEARLY COSTS | $1,107,330 | ||||
RECOMMENDED SAVINGS* | $119,849 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $95,385 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $3,495 | $1,500 |
$3,495
60,265
kWh
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $91,034 | $35,384 |
$91,034
1,569,562
kWh
|
- | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $13,827 | $220 |
$13,827
238,388
kWh
|
- | - | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $2,683 | - |
$2,164
37,661
kWh
|
$519
-
kW-mo/yr
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,018 | $1,320 |
$820
14,260
kWh
|
$198
-
kW-mo/yr
|
- | |
06 | 2.2135: Repair and eliminate steam leaks | $1,668 | $380 | - | - |
$1,668
-
MMBtu
|
|
07 | 2.4239: Eliminate or reduce compressed air usage | $6,124 | $22,000 |
$4,943
85,223
kWh
|
$1,181
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $119,849 | $60,804 |
$116,283
2,005,359
kWh
|
$1,898
-
kW-mo/yr
|
$1,668
-
MMBtu
|
||
TOTAL IMPLEMENTED | $95,385 | $35,764 |
$93,198
1,607,223
kWh
|
$519
-
kW-mo/yr
|
$1,668
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs