Assessment Year | 2013 |
---|---|
Principal Product | Fresh Veal and Lamb |
NAICS | 311612: Meat Processed from Carcasses |
SIC | 5147: Meats and Meat Products |
Sales Range | $100 M to 500M |
# of Employees | 50 |
Plant Area |
100,000
ft2
|
Annual Production | 19,500,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $384,470 | 4,417,231 |
kWh
|
$0.087 |
Electricity Demand | $64,057 | 10,000 |
kW-mo/yr
|
$6.41 |
Electricity Fees | $133,921 | - |
|
- |
Natural Gas | $39,488 | 5,303 |
MMBtu
|
$7.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $167,219 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,204 | $3,144 | - |
$3,204
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,773 | $22,500 |
$22,671
260,582
kWh
|
$2,679
-
kW-mo/yr
|
$1,423 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,705 | $3,219 |
$2,418
27,795
kWh
|
$288
-
kW-mo/yr
|
$(-1.0) | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $111,477 | $124,700 |
$101,234
1,163,614
kWh
|
$10,243
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $22,891 | $30,200 |
$20,789
238,959
kWh
|
$2,102
-
kW-mo/yr
|
- | |
06 | 2.7442: Keep doors and windows shut when not on use | $169 | $500 |
$169
1,940
kWh
|
- | - | |
TOTAL RECOMMENDED | $167,219 | $184,263 |
$147,281
1,692,890
kWh
|
$18,516
-
kW-mo/yr
|
$1,422 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs