ITAC Assessment: UF0501
ITAC logo
ITAC Assessment: UF0501
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Turpentines and Tall Oils (30 products)
NAICS 325194: Cyclic Crude, Intermediate, and Gum and Wood Chemical Manufacturing
SIC 2861: Gum and Wood Chemicals
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 740,520
ft2
Annual Production 70,939,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,617,971 32,723,792
kWh
Natural Gas $3,538,713 1,363,444
MMBtu
TOTAL YEARLY COSTS $6,156,684
RECOMMENDED SAVINGS* $1,711,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $317,468

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,393,980 $3,306,000 $2,040,000
25,500,000
kWh
- $(-646,020.0)
-
MMBtu
02 2.3212: Optimize plant power factor $154,176 $60,284 - $154,176 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $77,438 $2,184 $77,438
967,980
kWh
- -
04 2.2135: Repair and eliminate steam leaks $32,236 $1,794 - - $32,236
-
MMBtu
05 2.4133: Use most efficient type of electric motors $29,058 $39,050 $29,058
363,228
kWh
- -
06 2.2611: Moderate cooling tower outlet temperature $9,110 $700 $9,110
113,880
kWh
- -
07 2.2515: Use optimum thickness insulation $6,596 $11,216 - - $6,596
-
MMBtu
08 2.7121: Utilize daylight whenever possible in lieu of artificial light $5,834 - $5,834
72,927
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,020 $482 $3,020
37,755
kWh
- -
TOTAL RECOMMENDED $1,711,448 $3,421,710 $2,164,460
27,055,770
kWh
$154,176 $(-607,188.0)
-
MMBtu
TOTAL IMPLEMENTED $317,468 $115,710 $124,460
1,555,770
kWh
$154,176 $38,832
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs