Assessment Year | 2017 |
---|---|
Principal Product | Turpentines and Tall Oils (30 products) |
NAICS | 325194: Cyclic Crude, Intermediate, and Gum and Wood Chemical Manufacturing |
SIC | 2861: Gum and Wood Chemicals |
Sales Range | $50 M to 100M |
# of Employees | 75 |
Plant Area |
740,520
ft2
|
Annual Production | 70,939,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,617,971 | 32,723,792 |
kWh
|
$0.080 |
Natural Gas | $3,538,713 | 1,363,444 |
MMBtu
|
$2.60 |
TOTAL YEARLY COSTS | $6,156,684 | |||
RECOMMENDED SAVINGS* | $1,711,448 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $317,468 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $1,393,980 | $3,306,000 |
$2,040,000
25,500,000
kWh
|
- |
$(-646,020.0)
-
MMBtu
|
|
02 | 2.3212: Optimize plant power factor | $154,176 | $60,284 | - | $154,176 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $77,438 | $2,184 |
$77,438
967,980
kWh
|
- | - | |
04 | 2.2135: Repair and eliminate steam leaks | $32,236 | $1,794 | - | - |
$32,236
-
MMBtu
|
|
05 | 2.4133: Use most efficient type of electric motors | $29,058 | $39,050 |
$29,058
363,228
kWh
|
- | - | |
06 | 2.2611: Moderate cooling tower outlet temperature | $9,110 | $700 |
$9,110
113,880
kWh
|
- | - | |
07 | 2.2515: Use optimum thickness insulation | $6,596 | $11,216 | - | - |
$6,596
-
MMBtu
|
|
08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $5,834 | - |
$5,834
72,927
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,020 | $482 |
$3,020
37,755
kWh
|
- | - | |
TOTAL RECOMMENDED | $1,711,448 | $3,421,710 |
$2,164,460
27,055,770
kWh
|
$154,176 |
$(-607,188.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $317,468 | $115,710 |
$124,460
1,555,770
kWh
|
$154,176 |
$38,832
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs