ITAC Assessment: CO0595
ITAC logo
ITAC Assessment: CO0595
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Aluminum beverage cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 153,600
ft2
Annual Production 759,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Wyoming

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $296,103 14,923,200
kWh
Electricity Demand $355,999 33,094
kW-mo/yr
Electricity Fees $101,408 -
Natural Gas $356,354 36,316
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,658 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,388

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $18,970 $780 $9,910
520,400
kWh
$9,060
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,390 $290 $2,820
147,700
kWh
$2,570
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $998 $1,644 $522
27,387
kWh
$476
-
kW-mo/yr
- - -
04 2.2136: Install / repair insulation on steam lines $3,950 $630 - - $3,950
-
MMBtu
- -
05 2.4131: Size electric motors for peak operating efficiency $2,820 $1,280 $1,470
77,100
kWh
$1,350
-
kW-mo/yr
- - -
06 2.7232: Replace existing hvac unit with high efficiency model $13,170 $40,400 - - $13,170
-
MMBtu
- -
07 2.7243: Improve air circulation with destratification fans / other methods $12,810 $23,490 $(-360.0)
(-18,700)
kWh
$(-330.0)
-
kW-mo/yr
$13,500
-
MMBtu
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $5,630 $15,320 $3,150
165,400
kWh
$1,930
-
kW-mo/yr
- $300 $250
09 2.9111: Use solar heat to heat make-up air $4,920 $32,120 - - $4,920
-
MMBtu
- -
TOTAL RECOMMENDED $68,658 $115,954 $17,512
919,287
kWh
$15,056
-
kW-mo/yr
$35,540
-
MMBtu
$300 $250
TOTAL IMPLEMENTED $6,388 $1,934 $3,342
175,087
kWh
$3,046
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs