| Assessment Year | 2004 |
|---|---|
| Principal Product | Wooden laboratory cabinets |
| NAICS | 337127: Institutional Furniture Manufacturing |
| SIC | 3821: Laboratory Apparatus and Furniture |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
153,000
ft2
|
| Annual Production | 56,000
pieces
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $161,309 | 4,135,920 |
kWh
|
$0.039 |
| Electricity Demand | $61,145 | 9,231 |
kW-mo/yr
|
$6.62 |
| Electricity Fees | $6,872 | - |
|
- |
| Natural Gas | $80,206 | 9,976 |
MMBtu
|
$8.04 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $276,801 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $74,571 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.323: Optimize lot sizes to reduce inventory carrying costs | $151,225 | $150,000 |
$1,225
31,400
kWh
|
- | - | $112,500 | $37,500 | |
| 02 | 4.122: Develop standard procedures to improve internal yields | $72,400 | $49,500 | - | - | - | $16,400 | $56,000 | |
| 03 | 2.7313: Recycle air for heating, ventilation and air conditioning | $32,361 | $24,000 | - | - |
$32,361
-
MMBtu
|
- | - | |
| 04 | 2.2437: Recover waste heat from equipment | $16,989 | $31,278 | - | - |
$16,989
-
MMBtu
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,342 | $1,456 |
$889
22,800
kWh
|
$453
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $313 | $381 |
$207
5,301
kWh
|
$106
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,171 | $100 |
$2,432
62,360
kWh
|
$1,239
-
kW-mo/yr
|
- | $(-1,200.0) | $(-300.0) | |
| TOTAL RECOMMENDED | $276,801 | $256,715 |
$4,753
121,861
kWh
|
$1,798
-
kW-mo/yr
|
$49,350
-
MMBtu
|
$127,700 | $93,200 | ||
| TOTAL IMPLEMENTED | $74,571 | $49,600 |
$2,432
62,360
kWh
|
$1,239
-
kW-mo/yr
|
- | $15,200 | $55,700 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs