Assessment Year | 2001 |
---|---|
Principal Product | Aluminum and Copper Alloy Metal Castings |
NAICS |
n/a
|
SIC | 3362: |
Sales Range | $1 M to 5M |
# of Employees | 22 |
Plant Area |
50,000
ft2
|
Annual Production | 197,417
lb
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $11,183 | 151,524 |
kWh
|
$0.074 |
Electricity Demand | $8,526 | 1,025 |
kW-mo/yr
|
$8.32 |
Electricity Fees | $1,387 | - |
|
- |
Natural Gas | $13,364 | 1,839 |
MMBtu
|
$7.27 |
Fuel Oil #2 | $15,191 | 2,156 |
MMBtu
|
$7.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,575 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,899 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 3.5221: Recycle casting sand | $35,529 | $45,000 | - | - | $35,529 | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $370 | - |
$370
5,275
kWh
|
- | - | |
03 | 2.7229: Air condition only space necessary | $176 | $253 | - |
$176
-
MMBtu
|
- | |
04 | 2.3212: Optimize plant power factor | $2,500 | $8,350 |
$2,500
33,998
kWh
|
- | - | |
TOTAL RECOMMENDED | $38,575 | $53,603 |
$2,870
39,273
kWh
|
$176
-
MMBtu
|
$35,529 | ||
TOTAL IMPLEMENTED | $35,899 | $45,000 |
$370
5,275
kWh
|
- | $35,529 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs