ITAC Assessment: SU0101
ITAC logo
ITAC Assessment: SU0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Aluminum and Copper Alloy Metal Castings
NAICS
n/a
SIC 3362:
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area 50,000
ft2
Annual Production 197,417
lb
Production Hrs. Annual 2,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,183 151,524
kWh
Electricity Demand $8,526 1,025
kW-mo/yr
Electricity Fees $1,387 -
Natural Gas $13,364 1,839
MMBtu
Fuel Oil #2 $15,191 2,156
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,899

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Ancillary Material Cost Savings
01 3.5221: Recycle casting sand $35,529 $45,000 - - $35,529
02 2.4231: Reduce the pressure of compressed air to the minimum required $370 - $370
5,275
kWh
- -
03 2.7229: Air condition only space necessary $176 $253 - $176
-
MMBtu
-
04 2.3212: Optimize plant power factor $2,500 $8,350 $2,500
33,998
kWh
- -
TOTAL RECOMMENDED $38,575 $53,603 $2,870
39,273
kWh
$176
-
MMBtu
$35,529
TOTAL IMPLEMENTED $35,899 $45,000 $370
5,275
kWh
- $35,529
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs