Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Industrial and Medical Precision Ceramic Products
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 82,980
ft2
Annual Production 800,000
pieces
Production Hrs. Annual 4,352
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,686 2,069,461
kWh
Electricity Demand $24,711 5,659
kW-mo/yr
Electricity Fees $1,701 -
Natural Gas $67,506 13,003
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $281,329 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $188,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $78,922 $210,000 $79,775
979,191
kWh
$11,790
-
kW-mo/yr
$196 $(-12,839.0)
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,392 $39,424 $12,422
152,403
kWh
$2,938
-
kW-mo/yr
$32 - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,139 $1,760 $1,058
12,896
kWh
$78
-
kW-mo/yr
$3 - - -
04 2.7243: Improve air circulation with destratification fans / other methods $4,402 $2,405 $(-424.0)
(-6,448)
kWh
- - $4,826
-
MMBtu
- -
05 2.8114: Change rate schedules or other changes in utility service $8,219 $1,590 - - $8,219 - - -
06 3.6192: Use a less expensive method of waste removal $1,012 - - - - - - $1,012
07 4.513: Re-arrange equipment layout to reduce labor costs $172,243 $54,000 - - - - $172,243 -
TOTAL RECOMMENDED $281,329 $309,179 $92,831
1,138,042
kWh
$14,806
-
kW-mo/yr
$8,450 $(-8,013.0)
-
MMBtu
$172,243 $1,012
TOTAL IMPLEMENTED $188,647 $93,424 $12,422
152,403
kWh
$2,938
-
kW-mo/yr
$32 - $172,243 $1,012
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs