Assessment Year | 1983 |
---|---|
Principal Product | TANTULUM METAL |
NAICS |
n/a
|
SIC | 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum |
Sales Range | n/a |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $609,276 | 15,327,081 |
kWh
|
$0.040 |
Natural Gas | $195,708 | 61,059 |
MMBtu
|
$3.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,650 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,280 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2443: Re-use or recycle hot or cold process exhaust air | $9,373 | $20,660 | - |
$9,373
-
MMBtu
|
|
02 | 2.2515: Use optimum thickness insulation | $9,453 | $3,891 | - |
$9,453
-
MMBtu
|
|
03 | 2.2511: Insulate bare equipment | $756 | $236 | - |
$756
-
MMBtu
|
|
04 | 2.2511: Insulate bare equipment | $389 | $405 | - |
$389
-
MMBtu
|
|
05 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $888 | $135 |
$888
33,411
kWh
|
- | |
06 | 2.2122: Install / repair insulation on condensate lines | $343 | $80 | - |
$343
-
MMBtu
|
|
07 | 2.2122: Install / repair insulation on condensate lines | $937 | $181 | - |
$937
-
MMBtu
|
|
08 | 2.2122: Install / repair insulation on condensate lines | $277 | $45 | - |
$277
-
MMBtu
|
|
09 | 2.7261: Install timers and/or thermostats | $193 | $540 | - |
$193
-
MMBtu
|
|
10 | 2.4221: Install compressor air intakes in coolest locations | $41 | $148 |
$41
1,465
kWh
|
- | |
TOTAL RECOMMENDED | $22,650 | $26,321 |
$929
34,876
kWh
|
$21,721
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,280 | $261 | - |
$1,280
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs