Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product RADIATORS FOR TRUCKS
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 6,840
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,500 5,686,694
kWh
Natural Gas $64,002 25,027
MMBtu
LPG $63,399 22,472
MMBtu
Fuel Oil #2 $2,117 606
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,642 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,428

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $14,971 $900 - $14,971
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $12,118 $15,000 - $12,118
-
MMBtu
03 2.2444: Use hot process fluids to preheat incoming process fluids $4,096 $8,000 - $4,096
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $795 $306 $795
15,826
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $662 - $662
13,189
kWh
-
TOTAL RECOMMENDED $32,642 $24,206 $1,457
29,015
kWh
$31,185
-
MMBtu
TOTAL IMPLEMENTED $16,428 $1,206 $1,457
29,015
kWh
$14,971
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs