Assessment Year | 2005 |
---|---|
Principal Product | Metal cabinets and fume hoods |
NAICS | 337127: Institutional Furniture Manufacturing |
SIC | 3821: Laboratory Apparatus and Furniture |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
159,000
ft2
|
Annual Production | 75,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $241,964 | 6,203,880 |
kWh
|
$0.039 |
Electricity Demand | $91,718 | 13,847 |
kW-mo/yr
|
$6.62 |
Electricity Fees | $10,150 | - |
|
- |
Natural Gas | $320,822 | 39,903 |
MMBtu
|
$8.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $363,992 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $328,790 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.323: Optimize lot sizes to reduce inventory carrying costs | $167,500 | $150,000 | - | - | - | $112,500 | $55,000 | |
02 | 4.122: Develop standard procedures to improve internal yields | $97,500 | $61,250 | - | - | - | $22,500 | $75,000 | |
03 | 4.131: Modify process to reduce material use/cost | $60,000 | $20,500 | - | - | - | $60,000 | - | |
04 | 2.8114: Change rate schedules or other changes in utility service | $34,863 | $30,000 | - | - |
$34,863
-
MMBtu
|
- | - | |
05 | 2.4323: Use optimum size and capacity equipment | $1,451 | $3,000 |
$1,826
46,817
kWh
|
- | - | $(-375.0) | - | |
06 | 2.6218: Turn off equipment when not in use | $1,830 | $875 |
$1,830
46,925
kWh
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $339 | $616 |
$169
4,322
kWh
|
$170
-
kW-mo/yr
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $509 | $100 |
$995
25,521
kWh
|
$1,014
-
kW-mo/yr
|
- | $(-900.0) | $(-600.0) | |
TOTAL RECOMMENDED | $363,992 | $266,341 |
$4,820
123,585
kWh
|
$1,184
-
kW-mo/yr
|
$34,863
-
MMBtu
|
$193,725 | $129,400 | ||
TOTAL IMPLEMENTED | $328,790 | $235,725 |
$4,651
119,263
kWh
|
$1,014
-
kW-mo/yr
|
- | $193,725 | $129,400 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs