Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motorcycles, bicycles, and parts
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2214 #03 Y:2022 Reduce space conditioning during non-working hours $3,014 -
UW2214 #02 Y:2022 Install occupancy sensors $843 $970
UW2214 #01 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $1,351 $2,080
IP0016 #09 Y:2013 Install occupancy sensors $301 $490
IP0016 #08 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $1,271 $1,400
IP0016 #07 Y:2013 Size electric motors for peak operating efficiency $708 $1,622
IP0016 #06 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $19,081 $21,876
IP0016 #05 Y:2013 Lower light fixtures in high ceiling areas $3,008 $797
IP0016 #04 Y:2013 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $7,284 $1,400
IP0016 #03 Y:2013 Reduce the pressure of compressed air to the minimum required $197 -
IP0016 #02 Y:2013 Utilize higher efficiency lamps and/or ballasts $421 -
IP0016 #01 Y:2013 Lower temperature during the winter season and vice-versa $2,083 -
NC0472 #05 Y:2012 Utilize controls to operate equipment only when needed $24 -
NC0472 #04 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $188 $50
NC0472 #03 Y:2012 Utilize higher efficiency lamps and/or ballasts $84 $200
NC0472 #02 Y:2012 Install occupancy sensors $845 $1,125
NC0472 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $3,563 $16,950
SD0392 #04 Y:2006 Reduce the pressure of compressed air to the minimum required $1,970 -
SD0392 #03 Y:2006 Replace electrically-operated equipment with fossil fuel equipment $5,417 $17,500
SD0392 #02 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $7,991 $7,991