ITAC Assessment: IP0016
ITAC logo
ITAC Assessment: IP0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Motorcycle Exhaust Pipes
NAICS 336991: Motorcycle, Bicycle, and Parts Manufacturing
SIC 3751: Motorcycles, Bicycles, and Parts
Sales Range $5
M
to 10
M
# of Employees 107
Plant Area 66,000
ft2
Annual Production 20,200
pieces
Production Hrs. Annual 1,960
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,629 814,500
kWh
Electricity Demand $40,474 3,901
kW-mo/yr
Electricity Fees $11,521 -
Natural Gas $6,954 892
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,638

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 2.7221: Lower temperature during the winter season and vice-versa $2,083 - - - $2,083
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $421 - $421
6,546
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $197 - $98
1,529
kWh
$99
-
kW-mo/yr
- -
04 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $7,284 $1,400 - - - $7,284
05 2.7141: Lower light fixtures in high ceiling areas $3,008 $797 $1,828
28,436
kWh
$1,180
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,081 $21,876 $9,135
142,071
kWh
$9,946
-
kW-mo/yr
- -
07 2.4131: Size electric motors for peak operating efficiency $708 $1,622 $353
5,488
kWh
$355
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,271 $1,400 $1,271
19,766
kWh
- - -
09 2.7135: Install occupancy sensors $301 $490 $301
4,677
kWh
- - -
TOTAL RECOMMENDED $34,354 $27,585 $13,407
208,513
kWh
$11,580
-
kW-mo/yr
$2,083
-
MMBtu
$7,284
TOTAL IMPLEMENTED $10,638 $2,800 $1,271
19,766
kWh
- $2,083
-
MMBtu
$7,284
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs