| Assessment Year | 1986 |
|---|---|
| Principal Product | CHEMICAL IMTERMEDIATES |
| NAICS |
n/a
|
| SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $153,353 | 2,638,335 |
kWh
|
$0.058 |
| Natural Gas | $1,471 | 285 |
MMBtu
|
$5.16 |
| Fuel Oil #2 | $471,280 | 77,623 |
MMBtu
|
$6.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $108,615 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $26,207 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,355 | - |
$4,355
75,029
kWh
|
- | - | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $130 | $400 |
$209
3,517
kWh
|
$(-79.0)
-
MMBtu
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $14,137 | $537 | - | - |
$14,137
-
MMBtu
|
|
| 04 | 2.2121: Increase amount of condensate returned | $78,667 | $20,000 | - | - |
$78,667
-
MMBtu
|
|
| 05 | 2.4133: Use most efficient type of electric motors | $1,765 | $3,667 |
$1,765
30,481
kWh
|
- | - | |
| 06 | 2.7261: Install timers and/or thermostats | $1,976 | $600 | - | - |
$1,976
-
MMBtu
|
|
| 07 | 2.2113: Repair or replace steam traps | $6,449 | $500 | - | - |
$6,449
-
MMBtu
|
|
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,136 | $507 |
$1,136
19,637
kWh
|
- | - | |
| TOTAL RECOMMENDED | $108,615 | $26,211 |
$7,465
128,664
kWh
|
$(-79.0)
-
MMBtu
|
$101,229
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $26,207 | $1,944 |
$5,700
98,183
kWh
|
$(-79.0)
-
MMBtu
|
$20,586
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs