ITAC Assessment: ST0075
ITAC logo
ITAC Assessment: ST0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CHEMICAL IMTERMEDIATES
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,353 2,638,335
kWh
Natural Gas $1,471 285
MMBtu
Fuel Oil #2 $471,280 77,623
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,615 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,207

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,355 - $4,355
75,029
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $130 $400 $209
3,517
kWh
$(-79.0)
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $14,137 $537 - - $14,137
-
MMBtu
04 2.2121: Increase amount of condensate returned $78,667 $20,000 - - $78,667
-
MMBtu
05 2.4133: Use most efficient type of electric motors $1,765 $3,667 $1,765
30,481
kWh
- -
06 2.7261: Install timers and/or thermostats $1,976 $600 - - $1,976
-
MMBtu
07 2.2113: Repair or replace steam traps $6,449 $500 - - $6,449
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,136 $507 $1,136
19,637
kWh
- -
TOTAL RECOMMENDED $108,615 $26,211 $7,465
128,664
kWh
$(-79.0)
-
MMBtu
$101,229
-
MMBtu
TOTAL IMPLEMENTED $26,207 $1,944 $5,700
98,183
kWh
$(-79.0)
-
MMBtu
$20,586
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs