ITAC Assessment: NC0472
ITAC logo
ITAC Assessment: NC0472
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Cycling components
NAICS 336991: Motorcycle, Bicycle, and Parts Manufacturing
SIC 3751: Motorcycles, Bicycles, and Parts
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 28,000
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,151 311,100
kWh
Electricity Demand $8,204 960
kW-mo/yr
Electricity Fees $2,200 -
Natural Gas $3,672 474
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,704 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,775

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,563 $16,950 $1,848
35,599
kWh
$1,715
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $845 $1,125 $845
16,270
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $84 $200 $32
610
kWh
$30
-
kW-mo/yr
$22
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $188 $50 $154
2,970
kWh
$34
-
kW-mo/yr
-
05 2.6231: Utilize controls to operate equipment only when needed $24 - $24
462
kWh
- -
TOTAL RECOMMENDED $4,704 $18,325 $2,903
55,911
kWh
$1,779
-
kW-mo/yr
$22
TOTAL IMPLEMENTED $3,775 $17,000 $2,026
39,031
kWh
$1,749
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs