61
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UW2214 #03 Y:2022 | 03 | 2022 | Reduce space conditioning during non-working hours | $3,014 | - | |
UW2214 #02 Y:2022 | 02 | 2022 | Install occupancy sensors | $843 | $970 | |
UW2214 #01 Y:2022 | 01 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,351 | $2,080 | |
IP0016 #09 Y:2013 | 09 | 2013 | Install occupancy sensors | $301 | $490 | |
IP0016 #08 Y:2013 | 08 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,271 | $1,400 | |
IP0016 #07 Y:2013 | 07 | 2013 | Size electric motors for peak operating efficiency | $708 | $1,622 | |
IP0016 #06 Y:2013 | 06 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $19,081 | $21,876 | |
IP0016 #05 Y:2013 | 05 | 2013 | Lower light fixtures in high ceiling areas | $3,008 | $797 | |
IP0016 #04 Y:2013 | 04 | 2013 | Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $7,284 | $1,400 | |
IP0016 #03 Y:2013 | 03 | 2013 | Reduce the pressure of compressed air to the minimum required | $197 | - | |
IP0016 #02 Y:2013 | 02 | 2013 | Utilize higher efficiency lamps and/or ballasts | $421 | - | |
IP0016 #01 Y:2013 | 01 | 2013 | Lower temperature during the winter season and vice-versa | $2,083 | - | |
NC0472 #05 Y:2012 | 05 | 2012 | Utilize controls to operate equipment only when needed | $24 | - | |
NC0472 #04 Y:2012 | 04 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $188 | $50 | |
NC0472 #03 Y:2012 | 03 | 2012 | Utilize higher efficiency lamps and/or ballasts | $84 | $200 | |
NC0472 #02 Y:2012 | 02 | 2012 | Install occupancy sensors | $845 | $1,125 | |
NC0472 #01 Y:2012 | 01 | 2012 | Utilize higher efficiency lamps and/or ballasts | $3,563 | $16,950 | |
SD0392 #04 Y:2006 | 04 | 2006 | Reduce the pressure of compressed air to the minimum required | $1,970 | - | |
SD0392 #03 Y:2006 | 03 | 2006 | Replace electrically-operated equipment with fossil fuel equipment | $5,417 | $17,500 | |
SD0392 #02 Y:2006 | 02 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $7,991 | $7,991 |