Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motor vehicle parts and accessories
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0157 #06 Y:2019 Improve air circulation with destratification fans / other methods $3,916 $3,800
UU0157 #05 Y:2019 Turn off equipment when not in use $314 $218
UU0157 #04 Y:2019 Use / purchase optimum sized compressor $9,094 $8,488
UU0157 #03 Y:2019 Use radiant heater for spot heating $12,670 $22,920
UU0157 #02 Y:2019 Optimize plant power factor $2,079 $4,000
UU0157 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $15,321 $68,567
UU0154 #06 Y:2019 Recharge batteries on during off-peak demand periods $3,947 $2,000
UU0154 #05 Y:2019 Insulate bare equipment $10,215 $3,044
UU0154 #04 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $18,288 $2,040
UU0154 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $170,761 $461,313
UU0154 #02 Y:2019 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $262,908 $2,299,950
UU0154 #01 Y:2019 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $567,696 $2,355,000
UU0140 #07 Y:2018 Use or replace with energy efficient substitutes $655 $748
UU0140 #06 Y:2018 Analyze flue gas for proper air/fuel ratio $831 $400
UU0140 #05 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $2,388 $3,125
UU0140 #04 Y:2018 Turn off equipment when not in use $4,500 -
UU0140 #03 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $5,922 $2,000
UU0140 #02 Y:2018 Insulate bare equipment $6,232 $9,119
UU0140 #01 Y:2018 Turn off equipment when not in use $22,415 $2,000
UU0132 #09 Y:2018 Close outdoor air dampers during warm-up / cool-down periods $584 -