| Assessment Year | 2018 |
|---|---|
| Principal Product | Air bag initiators |
| NAICS | 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $100 M to 500M |
| # of Employees | 412 |
| Plant Area |
191,030
ft2
|
| Annual Production | 170,000,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $690,748 | 18,429,382 |
kWh
|
$0.037 | |
| Electricity Demand | $587,504 | 33,197 |
kW-mo/yr
|
$17.70 | |
| Electricity Fees | $39,811 | - |
|
- | |
| Natural Gas | $88,895 | 12,554 |
MMBtu
|
$7.08 | |
| Waste Disposal Costs | |||||
| Water Usage | $8,178 | 2,827 |
Tgal
|
$2.89 | |
| TOTAL YEARLY COSTS | $1,415,136 | ||||
| RECOMMENDED SAVINGS* | $42,942 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $33,668 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $22,415 | $2,000 |
$22,415
605,810
kWh
|
- | - | |
| 02 | 2.2511: Insulate bare equipment | $6,232 | $9,119 |
$3,319
89,698
kWh
|
$2,913
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,922 | $2,000 |
$3,578
96,718
kWh
|
$2,344
-
kW-mo/yr
|
- | |
| 04 | 2.6218: Turn off equipment when not in use | $4,500 | - |
$2,390
64,592
kWh
|
$2,110
-
kW-mo/yr
|
- | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,388 | $3,125 |
$1,193
32,255
kWh
|
$1,195
-
kW-mo/yr
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $831 | $400 | - | - |
$831
-
MMBtu
|
|
| 07 | 2.4322: Use or replace with energy efficient substitutes | $655 | $748 |
$161
4,352
kWh
|
$494
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $42,942 | $17,392 |
$33,056
893,425
kWh
|
$9,056
-
kW-mo/yr
|
$831
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $33,668 | $4,400 |
$28,383
767,120
kWh
|
$4,454
-
kW-mo/yr
|
$831
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs