Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Propellant Pellets
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 350
Plant Area 188,625
ft2
Annual Production 3,500
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $997,805 30,555,960
kWh
Electricity Demand $711,435 53,836
kW-mo/yr
Natural Gas $354,362 146,505
MMBtu
TOTAL YEARLY COSTS $2,063,602
RECOMMENDED SAVINGS* $1,033,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $199,264

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $567,696 $2,355,000 $596,044
18,250,000
kWh
$330,323
-
kW-mo/yr
$(-241,670.9)
-
MMBtu
$(-117,000.0)
02 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $262,908 $2,299,950 $342,560
10,380,600
kWh
$187,846
-
kW-mo/yr
$(-174,072.8)
-
MMBtu
$(-93,425.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $170,761 $461,313 $110,730
3,390,380
kWh
$60,031
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,288 $2,040 $11,773
360,314
kWh
$6,515
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $10,215 $3,044 - - $10,215
-
MMBtu
-
06 2.3132: Recharge batteries on during off-peak demand periods $3,947 $2,000 - $3,947
-
kW-mo/yr
- -
TOTAL RECOMMENDED $1,033,816 $5,123,347 $1,061,107
32,381,294
kWh
$588,662
-
kW-mo/yr
$(-405,528.7)
-
MMBtu
$(-210,425.0)
TOTAL IMPLEMENTED $199,264 $466,397 $122,503
3,750,694
kWh
$66,546
-
kW-mo/yr
$10,215
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs