Assessment Year | 2019 |
---|---|
Principal Product | Propellant Pellets |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $5 M to 10M |
# of Employees | 350 |
Plant Area |
188,625
ft2
|
Annual Production | 3,500
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $997,805 | 30,555,960 |
kWh
|
$0.033 |
Electricity Demand | $711,435 | 53,836 |
kW-mo/yr
|
$13.21 |
Natural Gas | $354,362 | 146,505 |
MMBtu
|
$2.42 |
TOTAL YEARLY COSTS | $2,063,602 | |||
RECOMMENDED SAVINGS* | $1,033,816 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $199,264 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $567,696 | $2,355,000 |
$596,044
18,250,000
kWh
|
$330,323
-
kW-mo/yr
|
$(-241,670.9)
-
MMBtu
|
$(-117,000.0) | |
02 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $262,908 | $2,299,950 |
$342,560
10,380,600
kWh
|
$187,846
-
kW-mo/yr
|
$(-174,072.8)
-
MMBtu
|
$(-93,425.0) | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $170,761 | $461,313 |
$110,730
3,390,380
kWh
|
$60,031
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,288 | $2,040 |
$11,773
360,314
kWh
|
$6,515
-
kW-mo/yr
|
- | - | |
05 | 2.2511: Insulate bare equipment | $10,215 | $3,044 | - | - |
$10,215
-
MMBtu
|
- | |
06 | 2.3132: Recharge batteries on during off-peak demand periods | $3,947 | $2,000 | - |
$3,947
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $1,033,816 | $5,123,347 |
$1,061,107
32,381,294
kWh
|
$588,662
-
kW-mo/yr
|
$(-405,528.7)
-
MMBtu
|
$(-210,425.0) | ||
TOTAL IMPLEMENTED | $199,264 | $466,397 |
$122,503
3,750,694
kWh
|
$66,546
-
kW-mo/yr
|
$10,215
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs