Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

519

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Truck and bus bodies
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CC0029 #07 Y:2023 Recover waste heat from equipment $38,352 $125,706
CC0029 #06 Y:2023 Use solar heat to make electricty $129,919 $1,308,548
CC0029 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $74,488 $34,000
CC0029 #04 Y:2023 Minimize condenser cooling water temperature $12,405 $5,000
CC0029 #03 Y:2023 Maintain machines to reduce leaks $11,616 $5,629
CC0029 #02 Y:2023 Install outside air damper / economizer on hvac unit $29,619 $32,820
CC0029 #01 Y:2023 Turn off equipment when not in use $30,487 $10,000
AS0564 #07 Y:2023 Eliminate leaks in water lines and valves $29 $79
AS0564 #06 Y:2023 Install heat pipes / raise cooling setpoint $463 $71
AS0564 #05 Y:2023 Install occupancy sensors $945 $110
AS0564 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $2,251 $143
AS0564 #03 Y:2023 Use computer programs to optimize hvac performance $2,752 $63
AS0564 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $4,294 $1,654
AS0564 #01 Y:2023 Use solar heat to make electricty $30,388 $182,064
GT0968 #05 Y:2023 Use solar heat to make electricty $159,818 $4,611,930
GT0968 #04 Y:2023 Turn off equipment when not in use $3,052 $3,250
GT0968 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $73,640 $23,680
GT0968 #02 Y:2023 Turn off equipment when not in use $104,725 $13,000
GT0968 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $64,657 $1,850
TT0293 #09 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $630 $2,000