ITAC Assessment: CC0029
ITAC logo
ITAC Assessment: CC0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Commercial Truck Body Parts
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 409,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,821,851 25,355,525
kWh
Electricity Fees $9,165 -
Natural Gas $972,338 85,820
MMBtu
TOTAL YEARLY COSTS $2,803,354
RECOMMENDED SAVINGS* $326,886 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $30,487 $10,000 - $30,487
-
MMBtu
02 2.7241: Install outside air damper / economizer on hvac unit $29,619 $32,820 $29,619
411,380
kWh
-
03 3.7311: Maintain machines to reduce leaks $11,616 $5,629 $2,311
32,093
kWh
$9,305
-
MMBtu
04 2.2623: Minimize condenser cooling water temperature $12,405 $5,000 $12,405
172,295
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $74,488 $34,000 $74,488
1,034,556
kWh
-
06 2.9114: Use solar heat to make electricty $129,919 $1,308,548 $129,919
1,804,426
kWh
-
07 2.2437: Recover waste heat from equipment $38,352 $125,706 - $38,352
-
MMBtu
TOTAL RECOMMENDED $326,886 $1,521,703 $248,742
3,454,750
kWh
$78,144
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs