| Assessment Year | 2024 |
|---|---|
| Principal Product | Commercial Truck Body Parts |
| NAICS | 336211: Motor Vehicle Body Manufacturing |
| SIC | 3713: Truck and Bus Bodies |
| Sales Range | $100 M to 500M |
| # of Employees | 250 |
| Plant Area |
409,000
ft2
|
| Annual Production | 100,000
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,821,851 | 25,355,525 |
kWh
|
$0.072 |
| Electricity Fees | $9,165 | - |
|
- |
| Natural Gas | $972,338 | 85,820 |
MMBtu
|
$11.33 |
| TOTAL YEARLY COSTS | $2,803,354 | |||
| RECOMMENDED SAVINGS* | $326,886 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $30,487 | $10,000 | - |
$30,487
-
MMBtu
|
|
| 02 | 2.7241: Install outside air damper / economizer on hvac unit | $29,619 | $32,820 |
$29,619
411,380
kWh
|
- | |
| 03 | 3.7311: Maintain machines to reduce leaks | $11,616 | $5,629 |
$2,311
32,093
kWh
|
$9,305
-
MMBtu
|
|
| 04 | 2.2623: Minimize condenser cooling water temperature | $12,405 | $5,000 |
$12,405
172,295
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $74,488 | $34,000 |
$74,488
1,034,556
kWh
|
- | |
| 06 | 2.9114: Use solar heat to make electricty | $129,919 | $1,308,548 |
$129,919
1,804,426
kWh
|
- | |
| 07 | 2.2437: Recover waste heat from equipment | $38,352 | $125,706 | - |
$38,352
-
MMBtu
|
|
| TOTAL RECOMMENDED | $326,886 | $1,521,703 |
$248,742
3,454,750
kWh
|
$78,144
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs