ITAC Assessment: AS0564
ITAC logo
ITAC Assessment: AS0564
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Truck water systems, tanks and tank kits
NAICS 332420: Metal Tank (Heavy Gauge) Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $10
M
to 50
M
# of Employees 29
Plant Area 60,147
ft2
Annual Production 189
units
Production Hrs. Annual 2,600
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,012 586,000
kWh
Electricity Demand $31,864 2,872
kW-mo/yr
Electricity Fees $5,401 -
Natural Gas $11,415 741
MMBtu
Waste Disposal Costs
Water Usage $18,319 2,288
Tgal
TOTAL YEARLY COSTS $136,011
RECOMMENDED SAVINGS* $41,122 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,326

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $30,388 $182,064 $27,958
237,334
kWh
$2,430
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,294 $1,654 $3,558
30,200
kWh
$456
-
kW-mo/yr
- $280
03 2.7226: Use computer programs to optimize hvac performance $2,752 $63 $2,416
20,510
kWh
$336
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,251 $143 $1,991
16,900
kWh
$260
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $945 $110 $814
6,914
kWh
$131
-
kW-mo/yr
- -
06 2.7272: Install heat pipes / raise cooling setpoint $463 $71 $459
3,893
kWh
$4
-
kW-mo/yr
- -
07 3.4154: Eliminate leaks in water lines and valves $29 $79 - - $29
-
Tgal
-
TOTAL RECOMMENDED $41,122 $184,184 $37,196
315,751
kWh
$3,617
-
kW-mo/yr
$29
-
Tgal
$280
TOTAL IMPLEMENTED $9,326 $1,939 $7,965
67,610
kWh
$1,052
-
kW-mo/yr
$29
-
Tgal
$280
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs