ITAC Assessment: LL0257
ITAC logo
ITAC Assessment: LL0257
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Chicken Products
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 1,400
Plant Area 260,000
ft2
Annual Production 270,400,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,488,189 57,565,477
kWh
Electricity Demand $434,277 108,677
kW-mo/yr
Electricity Fees $109,773 -
Natural Gas $4,125,991 450,499
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $857,052 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.2441: Preheat boiler makeup water with waste process heat $501,312 $98,000 - - - $501,312
-
MMBtu
- -
02 2.2135: Repair and eliminate steam leaks $302,971 $5,510 - - - $302,971
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,217 $7,960 $19,477
450,865
kWh
- $740 - - -
04 2.7111: Reduce illumination to minimum necessary levels $10,875 $810 $9,293
215,116
kWh
$1,184
-
kW-mo/yr
$398 - - -
05 2.1241: Reduce excessive boiler blowdown $10,380 $18,000 - - - $9,085
-
MMBtu
$1,295
-
Tgal
-
06 2.2511: Insulate bare equipment $5,404 $5,120 - - - $5,404
-
MMBtu
- -
07 2.7134: Use photocell controls $2,433 $450 $2,344
54,250
kWh
- $89 - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $889 $700 $272
6,307
kWh
- $10 - - $607
09 2.4231: Reduce the pressure of compressed air to the minimum required $2,389 $90 $2,302
53,298
kWh
- $87 - - -
10 2.7135: Install occupancy sensors $182 $420 $175
4,048
kWh
- $7 - - -
TOTAL RECOMMENDED $857,052 $137,060 $33,863
783,884
kWh
$1,184
-
kW-mo/yr
$1,331 $818,772
-
MMBtu
$1,295
-
Tgal
$607
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs