Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

520

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Motor vehicles and passenger car bodies
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0448 #06 Y:2025 Replace fossil fuel equipment with electrical equipment $8,205 $72,000
MS0448 #05 Y:2025 Replace fossil fuel equipment with electrical equipment $24,271 $200,000
MS0448 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $15,225 $34,284
MS0448 #03 Y:2025 Install replacement doors $10,741 $15,697
MS0448 #02 Y:2025 Air condition only space necessary $48,357 $35,751
MS0448 #01 Y:2025 Use solar heat to make electricty $217,439 $973,557
MS0446 #04 Y:2025 Replace existing hvac unit with high efficiency model $17,927 $24,500
MS0446 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,646 $4,652
MS0446 #02 Y:2025 Replace fossil fuel equipment with electrical equipment $25,744 $100,000
MS0446 #01 Y:2025 Use solar heat to make electricty $66,685 $716,889
MS0445 #07 Y:2025 Use / purchase optimum sized compressor $27,723 $35,999
MS0445 #06 Y:2025 Use optimum size and capacity equipment $5,573 $2,502
MS0445 #05 Y:2025 Level zero – install control systems for existing equipment $12,178 $45,000
MS0445 #04 Y:2025 Air condition only space necessary $40,482 $25,536
MS0445 #03 Y:2025 Change rate schedules or other changes in utility service $395 -
MS0445 #02 Y:2025 Use properly designed and sized hvac equipment $8,629 $44,500
MS0445 #01 Y:2025 Replace fossil fuel equipment with electrical equipment $17,535 $200,000
LE0598 #07 Y:2025 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $2,194,349 $9,580,000
LE0598 #06 Y:2025 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $11,873 $25,113
LE0598 #05 Y:2025 Use properly designed and sized hvac equipment $456,991 $909,175