ITAC Assessment: LE0598
ITAC logo
ITAC Assessment: LE0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Army Equipments
NAICS 336992: Military Armored Vehicle, Tank, and Tank Component Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $1
M
to 5
M
# of Employees 5,600
Plant Area 4,200,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,472,065 66,243,000
kWh
Electricity Demand $223,590 133,748
kW-mo/yr
Electricity Fees $1,362,522 -
Natural Gas $661,623 201,786
MMBtu
Waste Disposal Costs
Water Usage $218,412 36,402
Tgal
Water Disposal $215,332 33,128
Tgal
TOTAL YEARLY COSTS $7,153,544
RECOMMENDED SAVINGS* $3,254,758 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $32,559 $6,000 $31,496
463,182
kWh
$1,063
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $37,915 $27,000 $37,915
557,574
kWh
- - -
03 3.2173: Convert to robotic painting $218,856 $362,095 $18,317
269,372
kWh
$539
-
kW-mo/yr
- $200,000
04 2.7142: Utilize higher efficiency lamps and/or ballasts $302,215 $689,368 $292,195
4,296,985
kWh
$10,020
-
kW-mo/yr
- -
05 2.7233: Use properly designed and sized hvac equipment $456,991 $909,175 $449,401
6,608,833
kWh
$2,527
-
kW-mo/yr
$5,063
-
MMBtu
-
06 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $11,873 $25,113 $5,388
79,248
kWh
$(-295.0)
-
kW-mo/yr
$6,780
-
MMBtu
-
07 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $2,194,349 $9,580,000 $2,570,400
37,800,000
kWh
$90,180
-
kW-mo/yr
$(-466,231.0)
-
MMBtu
-
TOTAL RECOMMENDED $3,254,758 $11,598,751 $3,405,112
50,075,194
kWh
$104,034
-
kW-mo/yr
$(-454,388.0)
-
MMBtu
$200,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs