ITAC Assessment: UU0228
ITAC logo
ITAC Assessment: UU0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product NA
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 55
Plant Area 88,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,327 759,398
kWh
Natural Gas $76,537 6,974
MMBtu
TOTAL YEARLY COSTS $156,864
RECOMMENDED SAVINGS* $12,379 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,430

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1212: Operate boilers on high fire setting $5,182 $15,000 - $5,182
-
MMBtu
02 2.6218: Turn off equipment when not in use $3,009 $850 - $3,009
-
MMBtu
03 2.6218: Turn off equipment when not in use $2,221 $85 $293
2,933
kWh
$1,928
-
MMBtu
04 2.9114: Use solar heat to make electricty $1,330 $2,040 $1,330
13,299
kWh
-
05 2.6218: Turn off equipment when not in use $389 $170 $389
3,888
kWh
-
06 2.7272: Install heat pipes / raise cooling setpoint $248 $255 $248
2,480
kWh
-
TOTAL RECOMMENDED $12,379 $18,400 $2,260
22,600
kWh
$10,119
-
MMBtu
TOTAL IMPLEMENTED $5,430 $15,255 $248
2,480
kWh
$5,182
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs