Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product plastic car parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 67,000
ft2
Annual Production 350,000,000
units
Production Hrs. Annual 5,760
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,817 2,173,631
kWh
Electricity Demand $85,788 5,345
kW-mo/yr
Electricity Fees $21,665 -
Natural Gas $11,648 2,016
MMBtu
Other Energy $1,763 1
MMBtu
Waste Disposal Costs
Water Usage $17,000 3,213
Tgal
Water Disposal $2,328 3,213
Tgal
TOTAL YEARLY COSTS $216,009
RECOMMENDED SAVINGS* $1,774,258 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.114: Add/modify equipment to improve drying process $932,699 $336,920 $(-4,396.0)
(-125,950)
kWh
- $(-25,000.0) - $962,095
02 3.2176: Increase use of automation $795,203 $2,763,501 - - - - $795,203
03 2.9114: Use solar heat to make electricty $40,380 $545,958 $26,906
770,940
kWh
$13,474
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,359 $7,359 $1,207
34,570
kWh
$1,158
-
kW-mo/yr
- $(-6.0) -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,272 $5,188 $650
18,620
kWh
$622
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $643 $1,397 $397
11,362
kWh
$246
-
kW-mo/yr
- - -
07 2.7226: Use computer programs to optimize hvac performance $530 $1,940 $174
4,992
kWh
$356
-
kW-mo/yr
- - -
08 2.6211: Conserve energy by efficient use of vending machines $487 $1,215 $278
7,971
kWh
$209
-
kW-mo/yr
- - -
09 2.7144: Install spectral reflectors / delamp $407 $324 $34
983
kWh
$33
-
kW-mo/yr
- $340 -
10 2.7272: Install heat pipes / raise cooling setpoint $278 $454 $142
4,085
kWh
$136
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $1,774,258 $3,664,256 $25,392
727,573
kWh
$16,234
-
kW-mo/yr
$(-25,000.0) $334 $1,757,298
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs