ITAC Assessment: CL2001
ITAC logo
ITAC Assessment: CL2001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Medical supplies - adult incontinence products
NAICS 322291: Sanitary Paper Product Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area 669,200
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,500
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,906,877 50,081,000
kWh
Electricity Demand $990,742 112,701
kW-mo/yr
Electricity Fees $39,784 -
Natural Gas $202,345 25,474,800
MMBtu
Waste Disposal Costs
Water Usage $1 500
Tgal
TOTAL YEARLY COSTS $3,139,749
RECOMMENDED SAVINGS* $633,656 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,554

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $40,200 $61,410 $27,571
738,017
kWh
$12,629
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $584,752 $499,000 $409,771
10,783,459
kWh
$174,981
-
kW-mo/yr
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,354 - - $8,354
-
kW-mo/yr
-
04 2.6213: Turn off steam / hot water lines leading to space heating units $350 - - - $350
-
MMBtu
TOTAL RECOMMENDED $633,656 $560,410 $437,342
11,521,476
kWh
$195,964
-
kW-mo/yr
$350
-
MMBtu
TOTAL IMPLEMENTED $48,554 $61,410 $27,571
738,017
kWh
$20,983
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs