| Assessment Year | 2019 |
|---|---|
| Principal Product | Medical supplies - adult incontinence products |
| NAICS | 322291: Sanitary Paper Product Manufacturing |
| SIC | 3841: Surgical and Medical Instruments and Apparatus |
| Sales Range | $10 M to 50M |
| # of Employees | 500 |
| Plant Area |
669,200
ft2
|
| Annual Production | 1,000,000
units
|
| Production Hrs. Annual | 6,500
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,906,877 | 50,081,000 |
kWh
|
$0.038 | |
| Electricity Demand | $990,742 | 112,701 |
kW-mo/yr
|
$8.79 | |
| Electricity Fees | $39,784 | - |
|
- | |
| Natural Gas | $202,345 | 25,474,800 |
MMBtu
|
$0.008 | |
| Waste Disposal Costs | |||||
| Water Usage | $1 | 500 |
Tgal
|
$0.002 | |
| TOTAL YEARLY COSTS | $3,139,749 | ||||
| RECOMMENDED SAVINGS* | $633,656 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $48,554 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $40,200 | $61,410 |
$27,571
738,017
kWh
|
$12,629
-
kW-mo/yr
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $584,752 | $499,000 |
$409,771
10,783,459
kWh
|
$174,981
-
kW-mo/yr
|
- | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,354 | - | - |
$8,354
-
kW-mo/yr
|
- | |
| 04 | 2.6213: Turn off steam / hot water lines leading to space heating units | $350 | - | - | - |
$350
-
MMBtu
|
|
| TOTAL RECOMMENDED | $633,656 | $560,410 |
$437,342
11,521,476
kWh
|
$195,964
-
kW-mo/yr
|
$350
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $48,554 | $61,410 |
$27,571
738,017
kWh
|
$20,983
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs