| Assessment Year | 1990 |
|---|---|
| Principal Product | LEASHES, COLLARS & TAGS |
| NAICS |
n/a
|
| SIC | 3199: Leather Goods, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 307 |
| Plant Area |
n/a
|
| Annual Production | 2,000,000
pieces
|
| Production Hrs. Annual | 3,600
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $88,914 | 1,374,560 |
kWh
|
$0.065 |
| Natural Gas | $223,970 | 48,527 |
MMBtu
|
$4.62 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,142 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,811 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1122: Re-size charging openings or add a movable door on equipment | $10,331 | $5,700 | - |
$10,331
-
MMBtu
|
- | |
| 02 | 2.7261: Install timers and/or thermostats | $3,542 | $250 | - |
$3,542
-
MMBtu
|
- | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $3,062 | $5,000 | - |
$3,062
-
MMBtu
|
- | |
| 04 | 2.7494: Install storm windows and doors | $1,202 | $765 | - |
$1,202
-
MMBtu
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,500 | $1,200 | - |
$1,500
-
MMBtu
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $510 | - |
$510
8,206
kWh
|
- | - | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,138 | $500 | - |
$1,238
-
MMBtu
|
$(-100.0) | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $350 | $814 |
$350
5,275
kWh
|
- | - | |
| 09 | 2.6232: Install set-back timers | $507 | $200 |
$507
8,206
kWh
|
- | - | |
| TOTAL RECOMMENDED | $22,142 | $14,429 |
$1,367
21,687
kWh
|
$20,875
-
MMBtu
|
$(-100.0) | ||
| TOTAL IMPLEMENTED | $11,811 | $8,729 |
$1,367
21,687
kWh
|
$10,544
-
MMBtu
|
$(-100.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs