ITAC Assessment: AM0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Drill pipe, drill tubing, and well casings
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 275,000
ft2
Annual Production 258,000
pieces
Production Hrs. Annual 8,496
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $629,097 28,927,316
kWh
Electricity Demand $521,839 67,779
kW-mo/yr
Natural Gas $665,410 278,432
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,505 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,250

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,500 $2,500 $21,500
967,175
kWh
- - - - -
02 3.7195: Use teflon lined tanks $9,340 $110 - - - - $9,340
-
lb
-
03 2.3212: Optimize plant power factor $10,800 $17,500 - $10,800
-
kW-mo/yr
- - - -
04 2.7124: Make a practice of turning off lights when not needed $5,980 $510 $2,780
126,319
kWh
$3,200
-
kW-mo/yr
- - - -
05 2.4133: Use most efficient type of electric motors $2,900 $6,970 $1,853
84,115
kWh
$1,047
-
kW-mo/yr
- - - -
06 3.7311: Maintain machines to reduce leaks $1,860 $100 - - - $1,860
-
gal
- -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,350 $3,334 - - - - - $1,350
08 3.4151: Minimize water usage $795 - - - $795
-
Tgal
- - -
09 3.4154: Eliminate leaks in water lines and valves $560 $18 - - $560
-
Tgal
- - -
10 3.5248: Separate and recycle scrap metal to foundry or for sale $420 - - - - - $420
-
lb
-
TOTAL RECOMMENDED $55,505 $31,042 $26,133
1,177,609
kWh
$15,047
-
kW-mo/yr
$1,355
-
Tgal
$1,860
-
gal
$9,760
-
lb
$1,350
TOTAL IMPLEMENTED $31,250 $6,462 $24,280
1,093,494
kWh
$3,200
-
kW-mo/yr
$560
-
Tgal
$1,860
-
gal
- $1,350
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs