Assessment Year | 1997 |
---|---|
Principal Product | Drill pipe, drill tubing, and well casings |
NAICS |
n/a
|
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $100 M to 500M |
# of Employees | 450 |
Plant Area |
275,000
ft2
|
Annual Production | 258,000
pieces
|
Production Hrs. Annual | 8,496
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $629,097 | 28,927,316 |
kWh
|
$0.022 |
Electricity Demand | $521,839 | 67,779 |
kW-mo/yr
|
$7.70 |
Natural Gas | $665,410 | 278,432 |
MMBtu
|
$2.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,505 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,250 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $21,500 | $2,500 |
$21,500
967,175
kWh
|
- | - | - | - | - | |
02 | 3.7195: Use teflon lined tanks | $9,340 | $110 | - | - | - | - |
$9,340
-
lb
|
- | |
03 | 2.3212: Optimize plant power factor | $10,800 | $17,500 | - |
$10,800
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7124: Make a practice of turning off lights when not needed | $5,980 | $510 |
$2,780
126,319
kWh
|
$3,200
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $2,900 | $6,970 |
$1,853
84,115
kWh
|
$1,047
-
kW-mo/yr
|
- | - | - | - | |
06 | 3.7311: Maintain machines to reduce leaks | $1,860 | $100 | - | - | - |
$1,860
-
gal
|
- | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,350 | $3,334 | - | - | - | - | - | $1,350 | |
08 | 3.4151: Minimize water usage | $795 | - | - | - |
$795
-
Tgal
|
- | - | - | |
09 | 3.4154: Eliminate leaks in water lines and valves | $560 | $18 | - | - |
$560
-
Tgal
|
- | - | - | |
10 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $420 | - | - | - | - | - |
$420
-
lb
|
- | |
TOTAL RECOMMENDED | $55,505 | $31,042 |
$26,133
1,177,609
kWh
|
$15,047
-
kW-mo/yr
|
$1,355
-
Tgal
|
$1,860
-
gal
|
$9,760
-
lb
|
$1,350 | ||
TOTAL IMPLEMENTED | $31,250 | $6,462 |
$24,280
1,093,494
kWh
|
$3,200
-
kW-mo/yr
|
$560
-
Tgal
|
$1,860
-
gal
|
- | $1,350 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs