Assessment Year | 2000 |
---|---|
Principal Product | Hard Hats |
NAICS |
n/a
|
SIC | 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
58,000
ft2
|
Annual Production | 1,600,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $53,799 | 2,148,197 |
kWh
|
$0.025 |
Electricity Demand | $42,858 | 3,177 |
kW-mo/yr
|
$13.49 |
Electricity Fees | $23,433 | - |
|
- |
Natural Gas | $4,299 | 460 |
MMBtu
|
$9.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $218,796 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,963 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,960 | $350 |
$2,794
79,821
kWh
|
- | $166 | - | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $760 | - |
$716
20,454
kWh
|
- | $44 | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,653 | $6,495 |
$992
47,466
kWh
|
$1,149
-
kW-mo/yr
|
$512 | - | - | - | - | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $8,778 | $9,950 | n/a |
$8,281
276,271
kWh
|
- | $497 | - | - | $200 |
$(-200.0)
-
Tgal
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $34,295 | $82,500 |
$32,354
924,418
kWh
|
- | $1,941 | - | - | - | - | |
06 | 3.5217: Reuse / recycle/ sell paper products | $1,350 | $6,700 | - | - | - |
$1,350
-
lb
|
- | - | - | |
07 | 4.513: Re-arrange equipment layout to reduce labor costs | $168,000 | - | - | - | - | - | $168,000 | - | - | |
TOTAL RECOMMENDED | $218,796 | $105,995 |
$45,137
1,348,430
kWh
|
$1,149
-
kW-mo/yr
|
$3,160 |
$1,350
-
lb
|
$168,000 | $200 |
$(-200.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | $6,963 | $13,545 |
$3,786
127,287
kWh
|
$1,149
-
kW-mo/yr
|
$678 |
$1,350
-
lb
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs