Assessment Year | 1994 |
---|---|
Principal Product | Chemical Milling of Aluminum & Titanium Parts |
NAICS |
n/a
|
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 262,941
lb
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $86,277 | 793,962 |
kWh
|
$0.11 |
Natural Gas | $122,907 | 24,116 |
MMBtu
|
$5.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,492 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,424 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $613 | $300 |
$613
5,569
kWh
|
- | |
02 | 2.2511: Insulate bare equipment | $746 | $1,350 | - |
$746
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $336 | $353 |
$336
3,224
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,480 | $3,045 |
$3,480
31,653
kWh
|
- | |
05 | 2.7144: Install spectral reflectors / delamp | $1,331 | $2,205 |
$1,331
11,430
kWh
|
- | |
06 | 2.7144: Install spectral reflectors / delamp | $439 | $560 |
$439
3,810
kWh
|
- | |
07 | 2.7135: Install occupancy sensors | $3,008 | $3,515 |
$3,008
25,205
kWh
|
- | |
08 | 2.7134: Use photocell controls | $307 | $425 |
$307
2,345
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $232 | $165 |
$232
2,052
kWh
|
- | |
TOTAL RECOMMENDED | $10,492 | $11,918 |
$9,746
85,288
kWh
|
$746
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,424 | $5,550 |
$5,424
48,652
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs