| Assessment Year | 1994 |
|---|---|
| Principal Product | Chemical Milling of Aluminum & Titanium Parts |
| NAICS |
n/a
|
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
n/a
|
| Annual Production | 262,941
lb
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $86,277 | 793,962 |
kWh
|
$0.11 |
| Natural Gas | $122,907 | 24,116 |
MMBtu
|
$5.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,492 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,424 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $613 | $300 |
$613
5,569
kWh
|
- | |
| 02 | 2.2511: Insulate bare equipment | $746 | $1,350 | - |
$746
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $336 | $353 |
$336
3,224
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,480 | $3,045 |
$3,480
31,653
kWh
|
- | |
| 05 | 2.7144: Install spectral reflectors / delamp | $1,331 | $2,205 |
$1,331
11,430
kWh
|
- | |
| 06 | 2.7144: Install spectral reflectors / delamp | $439 | $560 |
$439
3,810
kWh
|
- | |
| 07 | 2.7135: Install occupancy sensors | $3,008 | $3,515 |
$3,008
25,205
kWh
|
- | |
| 08 | 2.7134: Use photocell controls | $307 | $425 |
$307
2,345
kWh
|
- | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $232 | $165 |
$232
2,052
kWh
|
- | |
| TOTAL RECOMMENDED | $10,492 | $11,918 |
$9,746
85,288
kWh
|
$746
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $5,424 | $5,550 |
$5,424
48,652
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs