Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electrical equipment for internal combustion engines
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0988 #06 Y:2024 Use solar heat to make electricty $91,923 $962,674
GT0988 #05 Y:2024 Optimize plant power factor $10,998 $47,093
GT0988 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $598 $200
GT0988 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $18,172 $1,850
GT0988 #02 Y:2024 Chill water to the highest temperature possible $5,947 $400
GT0988 #01 Y:2024 Apply for tax-free status for energy purchases $14,344 $800
GT0978 #06 Y:2024 Use solar heat to make electricty $310,364 $5,706,740
GT0978 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $23,328 $36,015
GT0978 #04 Y:2024 Conserve energy by efficient use of vending machines $292 $270
GT0978 #03 Y:2024 Install occupancy sensors $647 $390
GT0978 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $46,530 $1,850
GT0978 #01 Y:2024 Apply for tax-free status for energy purchases $14,430 $400
WV0629 #07 Y:2022 Establish a predictive maintenance program $1,933 $1,500
WV0629 #06 Y:2022 Develop a repair/replace policy $2,938 $1,349
WV0629 #05 Y:2022 Turn off equipment when not in use $6,486 $3,744
WV0629 #04 Y:2022 Reduce the pressure of compressed air to the minimum required $13,444 $15,140
WV0629 #03 Y:2022 Install occupancy sensors $13,895 $15,573
WV0629 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $15,878 $1,254
WV0629 #01 Y:2022 Upgrade controls on compressors $27,447 $88,959
TT0225 #05 Y:2019 Meter recycled water (to reduce sewer charges) $1,118 $1,900