Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Lead-Acid Batteries
NAICS 335911: Storage Battery Manufacturing
SIC 3694: Electrical Equipment for Internal Combustion Engines
Sales Range $100
M
to 500
M
# of Employees 268
Plant Area 159,000
ft2
Annual Production 2,104,536
units
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,090,753 34,648,613
kWh
Electricity Fees $10,998 -
Natural Gas $223,859 29,280
MMBtu
Other Gas $14,344 1
MMBtu
TOTAL YEARLY COSTS $2,339,954
RECOMMENDED SAVINGS* $141,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Other Gas Savings Personnel Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $14,344 $800 - - $14,344
-
MMBtu
-
02 2.2625: Chill water to the highest temperature possible $5,947 $400 $5,947
99,122
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,172 $1,850 $21,072
351,202
kWh
- - $(-2,900.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $598 $200 $598
9,965
kWh
- - -
05 2.3212: Optimize plant power factor $10,998 $47,093 - $10,998 - -
06 2.9114: Use solar heat to make electricty $91,923 $962,674 $91,923
1,523,379
kWh
- - -
TOTAL RECOMMENDED $141,982 $1,013,017 $119,540
1,983,668
kWh
$10,998 $14,344
-
MMBtu
$(-2,900.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Other Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs