ITAC Assessment: SF0599
ITAC logo
ITAC Assessment: SF0599
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Secondary Treated Water & Title 22 Recycled Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 330,000
ft2
Annual Production 730,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $527,256 2,524,260
kWh
Electricity Demand $65,223 3,859
kW-mo/yr
TOTAL YEARLY COSTS $592,479
RECOMMENDED SAVINGS* $195,812 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,366

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.6218: Turn off equipment when not in use $8,702 - $7,840
37,536
kWh
$862
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $49,633 $13,122 $44,685
213,925
kWh
$4,948
-
kW-mo/yr
-
03 4.652: Replace existing equipment with more suitable substitutes $81,680 $219,094 $69,380
332,154
kWh
$13,948
-
kW-mo/yr
$(-1,648.0)
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,031 $15,452 $3,031
14,509
kWh
- -
05 2.1336: Install equipment to utilize waste fuel $52,766 $303,600 $52,766
252,616
kWh
- -
TOTAL RECOMMENDED $195,812 $551,268 $177,702
850,740
kWh
$19,758
-
kW-mo/yr
$(-1,648.0)
TOTAL IMPLEMENTED $61,366 $28,574 $55,556
265,970
kWh
$5,810
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs