Assessment Year | 2023 |
---|---|
Principal Product | Secondary Treated Water & Title 22 Recycled Water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
330,000
ft2
|
Annual Production | 730,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $527,256 | 2,524,260 |
kWh
|
$0.21 |
Electricity Demand | $65,223 | 3,859 |
kW-mo/yr
|
$16.90 |
TOTAL YEARLY COSTS | $592,479 | |||
RECOMMENDED SAVINGS* | $195,812 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $61,366 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $8,702 | - |
$7,840
37,536
kWh
|
$862
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $49,633 | $13,122 |
$44,685
213,925
kWh
|
$4,948
-
kW-mo/yr
|
- | |
03 | 4.652: Replace existing equipment with more suitable substitutes | $81,680 | $219,094 |
$69,380
332,154
kWh
|
$13,948
-
kW-mo/yr
|
$(-1,648.0) | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,031 | $15,452 |
$3,031
14,509
kWh
|
- | - | |
05 | 2.1336: Install equipment to utilize waste fuel | $52,766 | $303,600 |
$52,766
252,616
kWh
|
- | - | |
TOTAL RECOMMENDED | $195,812 | $551,268 |
$177,702
850,740
kWh
|
$19,758
-
kW-mo/yr
|
$(-1,648.0) | ||
TOTAL IMPLEMENTED | $61,366 | $28,574 |
$55,556
265,970
kWh
|
$5,810
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs