Assessment Year | 1988 |
---|---|
Principal Product | MILK AND ICE CREAM |
NAICS |
n/a
|
SIC | 2024: Ice Cream and Frozen Desserts |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
n/a
|
Annual Production | 326,000
Tgal
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $457,494 | 8,915,299 |
kWh
|
$0.051 |
Natural Gas | $87,197 | 21,585 |
MMBtu
|
$4.04 |
Fuel Oil #2 | $15,484 | 4,312 |
MMBtu
|
$3.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,813 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,508 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $14,040 | $5,000 | - |
$11,986
-
MMBtu
|
$2,054
-
MMBtu
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,365 | - | - |
$1,507
-
MMBtu
|
$258
-
MMBtu
|
$(-400.0) | |
03 | 2.2135: Repair and eliminate steam leaks | $2,281 | $500 | - |
$1,947
-
MMBtu
|
$334
-
MMBtu
|
- | |
04 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $790 | $1,700 | - |
$675
-
MMBtu
|
$115
-
MMBtu
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $322 | $390 | - |
$275
-
MMBtu
|
$47
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,280 | $4,181 |
$12,280
239,449
kWh
|
- | - | - | |
07 | 2.4133: Use most efficient type of electric motors | $1,333 | $829 |
$1,333
26,084
kWh
|
- | - | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,383 | - |
$4,383
85,287
kWh
|
- | - | - | |
09 | 2.4312: Improve lubrication practices | $837 | - |
$837
16,413
kWh
|
- | - | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $1,182 | $1,200 |
$1,182
23,154
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $38,813 | $13,800 |
$20,015
390,387
kWh
|
$16,390
-
MMBtu
|
$2,808
-
MMBtu
|
$(-400.0) | ||
TOTAL IMPLEMENTED | $35,508 | $10,071 |
$17,500
341,149
kWh
|
$15,715
-
MMBtu
|
$2,693
-
MMBtu
|
$(-400.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs