ITAC Assessment: AT0109
ITAC logo
ITAC Assessment: AT0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MILK AND ICE CREAM
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 326,000
Tgal
Production Hrs. Annual 6,240
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $457,494 8,915,299
kWh
Natural Gas $87,197 21,585
MMBtu
Fuel Oil #2 $15,484 4,312
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,813 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,508

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $14,040 $5,000 - $11,986
-
MMBtu
$2,054
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,365 - - $1,507
-
MMBtu
$258
-
MMBtu
$(-400.0)
03 2.2135: Repair and eliminate steam leaks $2,281 $500 - $1,947
-
MMBtu
$334
-
MMBtu
-
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $790 $1,700 - $675
-
MMBtu
$115
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $322 $390 - $275
-
MMBtu
$47
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $12,280 $4,181 $12,280
239,449
kWh
- - -
07 2.4133: Use most efficient type of electric motors $1,333 $829 $1,333
26,084
kWh
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,383 - $4,383
85,287
kWh
- - -
09 2.4312: Improve lubrication practices $837 - $837
16,413
kWh
- - -
10 2.4221: Install compressor air intakes in coolest locations $1,182 $1,200 $1,182
23,154
kWh
- - -
TOTAL RECOMMENDED $38,813 $13,800 $20,015
390,387
kWh
$16,390
-
MMBtu
$2,808
-
MMBtu
$(-400.0)
TOTAL IMPLEMENTED $35,508 $10,071 $17,500
341,149
kWh
$15,715
-
MMBtu
$2,693
-
MMBtu
$(-400.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs