ITAC Assessment: SD0092
ITAC logo
ITAC Assessment: SD0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Microwave Components
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 470
Plant Area 100,000
ft2
Annual Production 35,000
pieces
Production Hrs. Annual 5,928
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,105 3,598,183
kWh
Natural Gas $993 128
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,197

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $338 $350 $338
4,103
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $579 $20 $579
7,034
kWh
03 2.6231: Utilize controls to operate equipment only when needed $513 $320 $513
6,155
kWh
04 2.7261: Install timers and/or thermostats $10,389 $1,800 $10,389
136,577
kWh
05 2.7135: Install occupancy sensors $5,378 $11,476 $5,378
58,617
kWh
TOTAL RECOMMENDED $17,197 $13,966 $17,197
212,486
kWh
TOTAL IMPLEMENTED $17,197 $13,966 $17,197
212,486
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs