ITAC Assessment: UF0575
ITAC logo
ITAC Assessment: UF0575
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Lithium-ion Batteries
NAICS 335911: Storage Battery Manufacturing
SIC 3691: Storage Batteries
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 240,000
ft2
Annual Production 6,417
units
Production Hrs. Annual 3,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $626,056 11,906,395
kWh
Electricity Demand $213,430 32,449
kW-mo/yr
Electricity Fees $127,411 -
Natural Gas $238,445 30,910
MMBtu
Waste Disposal Costs
Water Usage $18,519 4,720
Tgal
Water Disposal $17,607 1,687
Tgal
TOTAL YEARLY COSTS $1,241,468
RECOMMENDED SAVINGS* $766,653 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $586,028

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $320,724 $1,068,750 $450,500
8,500,000
kWh
$78,924
-
kW-mo/yr
$(-123,700.0)
-
MMBtu
$(-85,000.0) -
02 2.8113: Purchase gas directly from a contract gas supplier $175,432 - - - - $175,432 -
03 2.3191: Use demand controller or load shedder $59,112 $64,054 $44,173
833,448
kWh
$14,939
-
kW-mo/yr
- - -
04 2.7141: Lower light fixtures in high ceiling areas $5,193 $12,000 $3,573
67,408
kWh
$1,620
-
kW-mo/yr
- - -
05 2.4239: Eliminate or reduce compressed air usage $3,361 - $3,361
63,410
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,831 $290 $2,831
53,414
kWh
- - - -
07 4.662: Level one – add communication using iiot devices to existing control system to modify operations $200,000 - - - - - $200,000
TOTAL RECOMMENDED $766,653 $1,145,094 $504,438
9,517,680
kWh
$95,483
-
kW-mo/yr
$(-123,700.0)
-
MMBtu
$90,432 $200,000
TOTAL IMPLEMENTED $586,028 $1,133,094 $500,865
9,450,272
kWh
$93,863
-
kW-mo/yr
$(-123,700.0)
-
MMBtu
$(-85,000.0) $200,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs